Specifications include, but are not limited to: This project provides for the furnishing of all labor, materials, equipment and work necessary to perform staged construction for the relocation of approximately 6,500 feet of Morganza Road (SR 1009) and approximately 4,800 feet of Morgan Road (T-781). It also includes the construction of a two span concrete PA Bulb Tee Bridge carrying Morgan Road (T-781) over SR 0576, a single span concrete PA Bulb Tee Bridge carrying Morgan Road (T-781) over 0079 (Interstate 79), a drainage culvert extension on Morganza Road, and a roundabout with highway lighting at the intersection of Morganza Road (SR 1009), Morgan Road (T-781) and Baker Road (T-787). Major work items include the following: 762,721 CY Excavation, Classes 1, 1A, 1B, 2 & 4 43,328 CY Select Borrow Excavation, Various Types 131,397 SY Superpave Asphalt Materials (Base, Binder & Wearing Courses) 1,013 SY Asphalt/Cement Treated Base Course 60,382 SY Subbase No. 2A, Various Depths 1,222 CY Plain Cement Conc. Paving Various Depths 1,013 CY Long Life Concrete Pavement, 12” Depth 11,931 LF Drainage Pipe, Various Types and Sizes 14,030 LF 6” Pavement Base Drain 166 EACH Inlets, Endwalls, Manholes Various Types 3,934 LF Guiderail, Type 31 32,220 CY Class 3 Excavation 4,070 CY Flowable Backfill 11,310 CY Selected Borrow Exc. Structure Backfill 3,001 CY Class A Cement Concrete 537 CY Class AA Cement Concrete 714 CY Class AAAP Cement Concrete 2,147 LF Prestressed Concrete Beams 586,926 LBS Reinforcement Bars, Epoxy Coated 5,749 LF Temporary Concrete Barrier