Specifications include, but are not limited to: This project provides for slope repairs along the Turnpike roadway shoulders. Work includes drainage improvements, guiderail replacement, single face barrier installation, rock armor installation, and maintenance and protection of traffic. Work items include, but are not limited to: 14,442 CY Excavation, Various Types 5,190 SY Geotextile, Class 4, Type A 2,600 SY Geogrid, Class 1, Type A 12,372 TON Superpave Asphalt Mixture, HMA Courses, Various Mixes 7,797 TON Subbase (No. 2A) 3,401 TON Subbase under Guide Rail 12,996 SY Milling of Bituminous Pavement Surface, 2” Depth 5,549 LF Pavement Base Drain with Slope Drainage, Type II 22,556 LF Remove Existing Guide Rail 20,662.5 LF Type 31-S Guide Rail 6,358 LF Single Face Concrete Barrier, 52” 34,440 LF Temporary Concrete Barrier and Temporary Impact Attenuator 4,291 SY Shoulder Backup 7,360 SY Mulching-Bonded Fiber Matrix 2,299.5 LF Rock Armor 24,699 CY Rock Armor, Modified 7,442 LF Compost Filter Sock, 12” Diameter 2,556 LF Compost Filter Sock, 18” Diameter 22,817 LF Compost Filter Sock, 24” Diameter 26,244 LF 6” Waterborne Pavement Markings