Specifications include, but are not limited to: This project provides for shoulder resurfacing and rehabilitation, slope rehabilitation, and resurfacing of the existing bituminous travel lanes for the Ft. Littleton Interchange including resurfacing and patching of the Interchange shoulders. Work will also include parking area repairs, guide rail repairs, inlet and drainage pipe replacement and repair, and installation of Permanent Highly Reflectorized Polyurea Pavement Markings and Standard Pavement Markings at the Ft. Littleton Interchange and Ramps. This project also provides for the complete removal of existing paint system and the application of a new paint system and the application of an aesthetic concrete coating to concrete surfaces to the overhead bridges at Milepost 179.08 and Milepost 179.53 Maintenance and Protection of Traffic is also included.