Specifications include, but are not limited to: The scope of work includes, but is not limited to, a life-cycle cost evaluation of the option to convert the coal plant to gas/oil. Replacement of coal boilers, burners, and the upgrade of controls to comply with EPA and air quality regulations. Also provide additional boilers and master controls and SCADA system to supplement the output of the existing 800Hp boiler. Remove abandoned equipment, materials and system. Replace all pipe, valves and fitting for all steam and condensate systems as well as tanks, receivers and insulation as required. Provide new DA/feedwater systems, controls, and chemical treatment. Upgrade ventilation, plant HVAC and combustion air systems, lighting, and pneumatic and electrical systems that remain in service. Provide all required performance documentation to support modification of DEP permits and acquire all necessary L&I boiler and UCC permits.