Specifications include, but are not limited to: The project is for replacement of four single span structures over tributaries to Yellow Creek in Bedford County. All four structures will be replaced with new precast box culverts. Three of the culverts are located along SR 0026 and one is located along SR 0036. A left turn lane will be provided along SR 0026 eastbound approach to the SR 0036 intersection. The intersection will also be widened to better accommodate turning movements. SR 0026 will consist of full depth roadway reconstruction adjacent to the proposed culverts and will utilize a mill and overlay of the travel lanes with full depth widening within the intersection area and at the tie-in locations with existing SR 0026. SR 0036 will consist of full depth roadway reconstruction adjacent to the proposed culvert, with the remaining portion of SR 0036 consisting of mill and overlay of the travel lanes with full depth widening. To construct the proposed culverts and adjacent full depth roadway reconstruction, temporary road and stream crossings will be utilized to maintain traffic during construction. On SR 0026, two temporary road and stream crossings providing two lanes, one lane in each direction, are proposed on the downstream side of the existing bridge structures. On SR 0036, a signalized one lane temporary road and stream crossing is proposed on the upstream side of the existing bridge structure. Other roadway work will include drainage and guide rail upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0026, SECTION 13B in BEDFORD COUNTY, HOPEWELL TOWNSHIP. This project is located approximately 5 miles west of Hopewell, PA near the intersection of SR 0026 and SR 0036