Specifications include, but are not limited to: Two (2) repaving/widening projects identified on the Schuylkill River Trail in Montgomery County. Additionally, drainage issue areas that need contractor analysis and recommendations to improve are identified on the subject maps. During construction, the contractor will be required (to the best of their abilities) to keep the trail open for use. The project maps are approximations in length and width, all potential bidders are required to take field measurements to confirm or revise these details to acute accuracy levels. The Scope Details apply to both project segments (noted as segment 3 &4). The County is seeking separate bids for each trail project segment, as well as an approximate duration of time to complete eachsegment.