Specifications include, but are not limited to: A. Specifications: Manufacturer: Schindler Elevator Corporation Model number: Signature 20 Voltage: 480 volt, 3 phase Description: 2000 pound capacity, 2 landings with 1 front and 1 back door. B. For each quarterly inspection, the Contractor shall clean, lubricate and perform minor adjustments as required to the elevator machine, hydraulic pump unit, motors, controllers, interlocks, door rollers and limit switches, bearings and guides, door hangers, door operators, cart top, pit, shaft way and shaft way equipment. C. Items not covered as part of the quarterly inspections are: 1. Hydraulic elevator fluid 2. Parts and supplies required for repairs 3. Pressure tests 4. Valve disassemblies 5. Adjustments required due to accident, misuse or vandalism D. Report – The Contractor shall submit a report to the Commission, within two weeks of the maintenance visit, describing work performed, recommended repairs, test results, etc. Provide two (2) copies of the report to the owner’s representative.