Specifications include, but are not limited to: Phase 1 will include demolition of the existing buildings, with the exception of the smokestack and certain foundations, in addition to full environmental remediation of the site. Phase 2 will include the remaining demolition of building foundations. ; The soil from this APEC will be excavated down to bedrock and transported off-site for disposal. Prior to the excavation activities, extensive demolition and disposal of building debris will be required in order to allow access for the excavation activities. The area that will be excavated covers approximately 2,000 square feet, which will result in approximately 333 cubic yards of impacted soil. Soil analytical results indicate that this oil exceeds the PA regulated fill limits for lead and SVOCs, so the material will need to be disposed of as residual waste. It is possible that this soil will be classified as hazardous waste (pending toxicity characteristic leaching procedure analysis).