Specifications include, but are not limited to: Contractor shall provide all labor, equipment, tools, materials, storage, portable restroom, vehicles and expertise to perform all the tasks detailed in this Invitation to Bid. County will provide electric and water. 3.1 Contractor shall protect all fixtures, equipment, landscaping, and grounds during all work. 3.2 Contractor shall prep and paint as defined in “Sherwin-Williams Previously Coated Surfaces Specifications” (See Attachment) 3.3 County will be responsible to remove any vegetation that may block access to a lift or ladder. 3.4 Contractor shall apply two (2) coats of Sherwin Williams “H Dark Doranodic Brown” color. Contractor shall submit current color chips of specified paint to County to confirm color selection. The drying time between coats should be as defined in the “SherwinWilliams Previously Coated Surfaces Specifications”. 3.5 The running length of the area to be painted is 495 feet around the outside of the round building. The parapet panels and flashing consist of galvanized steel and are wider at the bottom then at the top. Please see Appendices A, B, & C for panel and flashing sizes. 3.6 The Elevator Lobbies Outside Wall Panels are 64” x 93”. All elevator panels will need to be caulked with Brown Silicone Caulk.