Specifications include, but are not limited to: a. Paint and Plaster repairs at various locations per the Scope of Work for each location and in compliance with: (i) US EPA Renovation, Repair, and Painting Regulations dated April 22, 2010; and, (ii) the School District’s Paint and Plaster Stabilization Project Plan and Procedures b. Responding to spill cleanups requiring HEPA vacuuming and wet wiping response actions of Paint and Plaster on all surfaces. This service will be required seven (7) days per week, twenty-four (24) hours per day. All service calls must be responded to immediately. c. Work will consist of the furnishing of all labor, materials, and equipment necessary for performing Paint and Plaster services. The Contractor will properly remove and dispose of waste generated materials in accordance with all federal, state, and local regulations. d. The Contractor shall provide all necessary tools and equipment of the trade to complete the required work for this contract including but not limited to, HEPA vacuum(s), airless sprayers, ground fault circuit interrupters (GFCI) panels, ladder(s), scaffold, and all associated painting and plaster equipment at no additional cost to the District. e. The Contractor shall provide all the necessary materials of the trade to complete the required work of this contract including but not limited to: 6 mil poly, duct tape, painters tape, signage, personnel protective equipment and all associated filters, at no additional charge to the School District. f. No additional charges will be paid by the School District to the Contractor for the repair or replacement of any tools or equipment, which is broken, vandalized, stolen, or wear out as a result of work done under this contract.