Specifications include, but are not limited to: The work under this contract includes, but is not limited to, renovations to a Storage Room on the 2nd Floor of the Main Terminal building, into a new Administrative Board Room, as well as interior renovations to the existing 3rd Floor administrative offices. An Alternate scope of work includes the replacement of existing finishes and plumbing fixtures (in existing locations) within the 2nd Floor public Toilet Rooms. Renovations to a 1,640sf Storage Room on the 2nd Floor of the Lehigh Valley International Airport Main Terminal building, into a new Administrative Board Room, and support spaces (relocated from the 3rd Floor). Interior renovations to the existing 3rd Floor are also part of the scope of work, and include: the removal of some interior partitions to provide an open office area; new private Offices & Break Room; and partial replacement of finishes. An Alternate scope of work includes the replacement of existing finishes and plumbing fixtures (in existing locations) within the 2nd Floor public Toilet Rooms.