Specifications include, but are not limited to:The Pennsylvania Game Commission, Northeast Region, requires bulldozed fire lines to be constructed in a forested area and the cutting of snags. Services shall include, but not be limited to, the furnishing of all labor, superintendence, tools and equipment for the construction of bulldozed fire lines and cutting of snags as per the attached specifications. The contractor is required to provide the equipment, labor, insurance, and all miscellaneous expenses to complete the operation. Fire line to Build - Clear trees and top layer of soil from designated locations on State Game Land as identified on the attached map to a width of no less than 8 feet. Sections of the proposed break are located in steep and rocky terrain. Of the 45,366feet of fire line to be constructed with a bulldozer, approximately 2,800 ft. is previously existing trail. The fire lines are to be cleared of the top layer of soil (humus and leaf litter) at a minimum width of eight (8) feet and maximum of twelve (12) feet as noted in the attached map. There are approximately 150 snags that will need to be cut and all woody debris shall be less than 4 ft. in height. Stump heights will be reduced to less than 12 inches.