Specifications include, but are not limited to: Administration; co-ordination; project management; mobilize; demobilize; site moving; site clean-up; install safety measures; Install booms, barriers, turbidity barriers, sediment control device; field inspection, layout and mark pile locations; maintain access to all portions of pier during Construction; Submittals reviews; address Punch List; Field touch up coatings; develop & submit As-Built Drawings.; Permanently remove lower D fenders from the Upriver seawall and store at Owner designated location. Trim abandoned hardware flush with the face of seawall. Remove & reinstall guardrail, if required.; Remove existing D and foam filled fenders from the Downriver seawall. Store at Owner designated location. Relocate/reinstall fenders specified to be relocated/reinstalled in Contract Drawings, as specified. Trim abandoned hardware flush with the face of concrete seawall. Remove & reinstall guardrail, if required.; On the Upriver side, cut timber low deck, prepare seawall, procure, splice & install CTE coated front row Test Pile. Perform test as specified & submit results. Procure material, fabricate, coat & install mounting plate assembly with grout and finish pile, as shown in Contract Drawings, after Engineer's acceptance.