Specifications include, but are not limited to: The project consists of the removal/ replacement the existing bridge deck for a Single span Prestressed Concrete Spread Box Beam Bridge Rehab (over Kitchen Creek) using construction staging and temporary traffic signals. Other work includes rock scour protection, protective coating to barriers & substructure, epoxy based surface treatment to bridge deck, excavation, full depth bituminous roadway approach work, guide rail upgrades, temporary concrete barrier, temporary traffic control, E & S Control measures, pavement markings, signing, miscellaneous concrete-bridge work, removal of portion of bridge, steel bridge railing and temporary excavation & support all work contained within an overall project length of 681 linear feet (0.129 mile).