Specifications include, but are not limited to: The improvement of a certain section of highway in LACKAWANNA COUNTY, THORNHURST TOWNSHIP, COMMONWEALTH OF PENNSYLVANIA, STATE ROUTE 2013, SECTION 250. The project being situated as follows: From a point approximately 0.7 mile north of the intersection with SR 2016 (Bear Lake Road) at segment 0060 offset 1224 (station 37+07) to a point approximately 0.88 mile north of the intersection with SR 2016 (Bear Lake Road) at segment 0070 offset 0499 (station 46+62) along SR 2013. The project consists of the removal the existing superstructure and constructing the proposed superstructure using construction staging and temporary traffic signals per approved traffic control plan. Abutments beam seats will be reconstructed to accommodate the new superstructure with substructure patching as required. An epoxy based surface treatment will be applied to the bridge deck. Rock lining will be placed in front of abutments. Minor roadway approach work includes pavement restoration and guide rail upgrades, all work contained within an overall project length of 855 linear feet (0.162 mile) as indicated on the approved drawings included in the bid package.