Specifications include, but are not limited to: Mowing - Each mowing to consist of the following (See map A): 1) Grass will be cut every two weeks (weather permitting) or as determined by project manager. Mowed and trimmed areas shall be of a neat and uniform height (2”-3”) and appearance without ragged ends or un-mowed ridges or patches. Vendor must avoid spraying grass clippings on buildings and their foundations, fences, or other obstacles. 2) Hand mowing is necessary along the front bank and sidewalk areas. 3) Carefully trim around all obstacles including but not limited to fence, pond, bridge, trees, shrubbery, etc. 4) Debris Removal including fallen tree limbs and other debris shall be collected after storms (i.e. as needed). Branch/debris pick up is the responsibility of the vendor prior to mowing as needed. Debris may not be disposed of on the Joseph Priestley property. 5) Vacuum all lawn clippings from ramps, pathways, sidewalks, and steps. 6) Filling of ground hog holes is allowable