Specifications include, but are not limited to:The work of this project generally includes, but is not limited to, the construction of a 54,000 SF multi-purpose aircraft hangar and 3,000 SF connecting office area, including all associated building plumbing, HVAC, fire protection/detection, security, mechanical and electrical systems. Additionally the project includes the construction of an aircraft parking apron no larger than 9,500 SY in size (see Base and Alternate Bid descriptions). Additional site work includes 2,500 SY of bituminous stub taxiway, service road and related pavements, as well as the realignment of an existing access road; construction of a parking area and driveways; site grading and drainage; extension of existing gas, water, sewer, cable, and telephone utilities; fencing and gates, airfield lighting, signage and pavement markings.