Specifications include, but are not limited to:Green Street improvements, including but not limited to, sidewalk, curb, ADA ramps, cartway widening, storm sewer, speed humps. cartway overlay and line striping. 1. 1 LS Traffic Control 2. 1 LS Erosion control measures including compost sock, temp seed and mulch, filter bag pumping. 3. 1 LS Removal of Trees, hedge and stump at 143, 155, 156 and 163 Green Street 4. 950 SF Sidewalk Demolition/Removal 5. 290 LF Curb Demolition/Removal 6. 1,600 SY 4’ wide curbline, paving notch and structure milling 7. 690 LF Curb Installation 8. 5,700 SF Sidewalk Installation 9. 12 EA ADA Ramp detectable warning surface 10. 5,700 SF Concrete Driveway Apron Installation 11. 275 LF Supply and install grade adjustment wall including excavation, stone base, backfill and drainage 12. 1 LS Supply and install precast concrete steps and sidewalk connections at 123/125 Green Street including excavation/removal of existing and stone base 13. 1 LS Modify cistern at 1636 Greet Street, including excavation, stone adjustment, and supply and install precast concrete top w/MH frame and cover 14. 340 LF Supply and install 15” RCP 15. 2 EA Remove existing inlet and replace with precast concrete storm inlet box with Type M Top, including pipe adjustments as needed and road restoration