Specifications include, but are not limited to: Extensive rehabilitation of the existing bridge (City Bridge #7, also known as Montgomery County Bridge #200), a four-span reinforced concrete arch bridge with three additional concrete-encased-multi-steel girder approach spans (two are located within the Venice Island substructure unit and one spans between the Venice Island substructure unit and the Phila. abutment) carrying Green Lane/Belmont Avenue over the Schuylkill River, Conrail, the Manayunk Canal, and the Schuylkill River Trail;Bridge deck evaluation/testing to determine appropriate rehabilitation method (repair or replace);The design and construction of repairs to all superstructure, substructure, and foundation elements, including all underwater portions of the structure; Travel lane and sidewalk (both on and off structure) reconfiguration to accommodate traffic demands;Full depth roadway reconstruction and limited repaving;Curb and sidewalk reconstruction; Street lighting improvements;ADA-compliant curb ramp construction;Traffic signal improvements;Intersection reconfiguration;Utility relocation.