Specifications include, but are not limited to: This project provides for the furnishing of all labor, material, equipment and work necessary to erect two (2) mainline cashless tolling facilities, including gantry structures, and concrete utility buildings, complete and operable, including bituminous pavement. Work items include, but are not limited to: 877 CY Excavation, Class 1 303 CY Selected Borrow Excavation, Various 1,908 SY Subbase 6” Depth (No. 2A) 329 TON Superpave Asphalt Material (Base Course) 3,632 SY Superpave Asphalt Materials (Binder & Wearing Courses) 1,525 LF Guide Rail 816 LF Concrete Barrier, Various Types and Sizes 591 CY Class 3 Excavation 196 CY Class A Cement Concrete 290 CY Class AAA Cement Concrete 97,142 LB Fabricated Structural Steel, Various Grades 67,400 LB Reinforcement Bars, Epoxy Coated 294 LF Drilled Shafts in Rock 116 LF Drilled Shafts in Soil