Specifications include, but are not limited to: CONSTRUCTION OF THE ASHFORD SERVICE AREA SANITARY SEWER EXTENSION INCLUDING NEWTOWN HUNT PUMP STATION #2 AND GOSHEN ROAD PUMP STATION #3. The Ashford Service Area consists of a network of gravity collection sewer and manholes, two (2) new duplex pump stations, and conveyance force mains. The Newtown Hunt Pump Station No 2 Service Area contains one new duplex pump station (175 GPM Each) and approximately 2,700 L.F. of 6” C900 or equivalent force main and appurtenances, 6,000 L.F. 8” P.V.C. gravity sewer mains, 45 pre-cast concrete manholes with frame and covers, 30 lateral connections, and local highway and off-street restorations. The Goshen Road Pump Station No. 3 Service Area contains one new duplex pump station (250 GPM Each) and approximately 4,700 L.F. of 6” C900 or equivalent force main and appurtenances, 30,400 L.F. 8” P.V.C. and 1,100 L.F. of 10” P.V.C. gravity sewer mains, 130 pre-cast concrete manholes with frame and covers, 190 lateral connections, and local highway, state highway and off-street restorations.