Specifications include, but are not limited to: As the result of a recent air pressure test required by Ebensburg Sanitary Sewer System. This above location requires repairs resulting from an unsuccessful air pressure test of our lateral sewage system. • Cutting asphalt and excavation in areas as needed at repair site, restore areas of work to original existing condition to include asphalt repairs and landscaping as required. • Removing and replacing existing sewer line and repair connections at water/separator tanks as needed using approved pipe and fittings to standards set by local code. • Install traps and cleanouts as required by local code to include cast iron view ports flush with asphalt. • Test system with a passing result of 5 p.s.i. for 15 minutes with no drop-in pressure. • Schedule test with Ebensburg authorities as required.