Specifications include, but are not limited to: BITUMINOUS RESURFACING BETWEEN MILEPOST 84.93 AND MILEPOST 94.13 AND SHOULDER AND SLOPE WORK BETWEEN MILEPOST 94.13 AND MILEPOST 99.00 IN WESTMORELAND COUNTY. This contract provides for milling and paving the Turnpike roadway with stone matrix wearing course. Work will also include shoulder reconstruction, guide rail replacement, drainage channel reconstruction, and repairing and replacement of inlets including replacing type A inlets with new inlets, drain pipes and end walls. This contract also provides for bridge repairs which includes Class AA concrete repairs and concrete deck repair and bridge expansion joint system. Additional work includes Donegal maintenance facility mill and overlay, installation of geosynthetic reinforced slopes and rock armor along the eastbound shoulder slope and milling and paving of the Donegal Interchange ramps at MP 90.6. 41,011 CY Excavation, Class 1, 1A, 2 Excavation. 584,612 SY Milling of Existing Bituminous Pavement, Various Depths 8,078 TONS Superpave Wearing Course, PG 64-22, 12.5 mm Mix, SRL-E 37,970 TONS Stone Matrix Asphalt Wearing Course, PG 76-22, 12.5 mm Mix, SRL-E 1,050 TONS Superpave Wearing Course, PG 76-22, 12.5 mm Mix, SRL-E 7,886 TONS Superpave Base Course, PG 64-22, 25 mm Mix 11,182 CY No.57 Coarse Aggregate 331,764 SY Micro Milling, ½” Depth 256 EACH Inlet Repairs 25 EACH Inlet Replacements 2,919.5 LF Type 2- S Guide Rail 12,175 LF Type 31-S Guide Rail 487 LF Single Face Concrete Barrier, 52” 186,449 EACH Sonic Nap Alert Pattern (SNAP) 3,075 CY Rock Armor, Modified 27,252 LF Compost Filter Sock, 18” 6,469 CY Corrosion Resistant Gabions, Type B 19,062 LF Temporary Concrete Barrier and Temporary Impact Attenuator 10,248 LF Temporary Concrete Barrier 244,499 LF Permanent Preformed Patterned Reflective Pavement Marking, 6” 654,322 LF 4” Standard Pavement Markings