Specifications include, but are not limited to:The contractor will provide all relevant audio, video, and automation hardware and software for this design. This project involves the removal of an existing system including racked equipment, and old components from the courtroom. The design should not include components that are proprietary to the vendor (invented or manufactured by the contractor unless noted and approved by the Court). The contractor will provide documentation of all hardware, component placement, and wiring in the form of “as-built” auto cad drawings at the completion of the installation. The Court shall provide electrical service, however, the contractor will need to utilize existing infrastructure (conduits to and from the electrical closet where the head end rack will be located).