Specifications include, but are not limited to: Work shall consist of roadway reconstruction through milling to a depth of 8-inches and placement of 8-inches of Superpave Asphalt Mixture Design, WMA Base Course, PG 64-22, 0.3 to 3.0 Million ESALS, 25.0 MM Mix in the amount of 12,500 square yards on Allendale Road from Simpson Ferry Road to the Borough Line. Roadway Repair Work includes the following: a. Written and posted notification of displacement of parking by construction activities on affected street. b. Maintenance and Protection of Traffic. c. Work consists of milling existing pavement and subbase material full width to a depth of 8”, removal of bituminous and base material, place and compact 8” Superpave Asphalt Mixture Design, WMA Base Course, PG 64-22, 0.3 to 3.0 Million ESALS, 25.0 MM Mix in two (2) 4-inch lifts. (Includes trucking and disposal). d. Contractor to remove and dispose of all milled and excavated material. e. Subgrade remediation at direction of Engineer. f. Adjustment of all vent boxes, gas, water and utility valve covers and sanitary and storm sewer manholes to finished grade. Adjustment rings shall be provided and installed under this contract. g. Subgrade proof roll. h. Application of bituminous tack coat on all structures. i. Bituminous sealing of curbs, structures and longitudinal and transverse joints. j. Application of new pavement markings replacing existing markings removed during milling operations at locations designated by the Engineer. k. Cleaning of roadway after completion.