Specifications include, but are not limited to: Structural rehabilitation of a subsurface utility vault, relocation of utilities, backfill of vault, and removal of existing sidewalk and replacement with new sidewalk along 5th street: 1. Utility vault a. Administrate and construct modifications to the existing utility vault to allow the relocation of existing utilities by utility providers, and relocate/modify other existing utilities to allow complete backfill of the vault including required demolition, support and protection of utilities, maintenance of traffic, reinforcement of existing structural features, construction of new structural supports, and removal and replacement with new of the entire sidewalk fronting 5th Street. b. Provide all needed traffic control and safety measures during the course of construction. CONTRACTOR shall prepare a detailed WORK schedule that minimizes the project duration. CONTRACTOR’s work is limited to South 5th Street unless determined after commencement of work that additional consequential work is required – no portion of the Work shall extend onto Penn Street or Cherry Street unless otherwise required as per previous sentence Access to buildings from 17 South 5th Street and south to Cherry St. shall be maintained as needed at all times. 2. Site Work a. Provide, maintain, and remove at the completion of construction all required traffic control signage and barricades. b. Provide labor for manual traffic control as may be required. c. Provide access to the BUILDING entrance for Building Owner during the course of the project.