Specifications include, but are not limited to: Phase 1 This phase includes, but is not limited to, street level improvements along the south side of Market Street including, but not limited to: 1. Street level a. Stair headhouse (southwest corner only) b. Stair repair/replacement c. Curb bumpout d. Station waterproofing e. Pavement repair/replacement f. Sidewalk repair/replacement g. Curb ramps h. Pavement striping i. Architectural finishes j. Architectural amenities k. Signage (way finding) l. Lighting, power, communications m. Security n. Technology o. Fire Alarm p. Traffic signal q. Landscaping *Stair and hallway shutdown required for construction of headhouses. Phase 2 This phase includes, but is not limited to, mezzanine and platform level improvements on south side of Market Street, including, but not limited to: 1. Stairways corridors and mezzanines a. Waterproofing (interior) b. Concrete restoration c. Stair repair/replacement d. Architectural finishes (ceilings, walls, floors) e. Ornamental fencing f. Lighting, power, communications g. Security h. Technology i. Fire Alarm j. Signage (way finding and advertising)