Specifications include, but are not limited to: Bituminous Surface Treatment (double chip application) of the following roads and lengths: o Henning Road - 0.57 mile – 6,020 SY • Double Application Of Bituminous Seal Coat Treatment of the following roads covering approximately 1.32 miles total: o Bow Lane – 0.33 mile – 5,420 SY o Gail Drive – 0.34 mile – 5,584 SY o St. Anthony Way – 0.10 mile – 1,643 SY o Woodland Way – 0.08 mile – 1,313 SY o Sunny Ridge Road – 0.23 mile – 3,777 SY o Shady Lane – 0.13 mile – 2,128 SY o Cinderella Court – 0.11 mile – 1,808 SY During the performance of the Work, Contractor shall follow this construction sequence. 1. Contact all underground utility owners, Owner, and Engineer at least seventy-two (72) hours prior to beginning construction. 2. Pre-construction meeting including Contractor, Owner, Engineer, and applicable utility owners. 3. Mobilize – including temporary facilities. 4. Contact property owners and residents at least forty-eight (48) hours prior to the start of construction on or near their properties or residences. 5. Locate, relocate, and abandon utilities as required by owner or authority having jurisdiction over the specific utility system. 6. Install stationary traffic control devices in accordance with State and local permit requirements and as necessary to maintain the continued, steady, safe flow of traffic. Flagmen and safety cones must be provided simultaneously with all construction work in and along streets. 7. Perform roadway paving and all other construction items. 8. Final cleaning and punchlist items.