Specifications include, but are not limited to:. Work includes cold-in-place recycling and Super Pave overlay on 2 township roadways. . School House Road (TR684) Approximately 2,589 square yards cold-in-place recycling followed by Super Pave (9.5mm) scratch course, followed by Super Pave, HMA Wearing Course PG 64-22, <0.3 million ESAL's, 9.5mm mix, 1 ^ inch compacted depth, SRL-L, in place as directed. Work includes 2 intersections. Item 2: Gray Road (TR664) Approximately 10,230 square yards cold-in-place recycling followed by Super Pave (9.5mm) scratch course, followed by Super Pave, HMA Wearing Course, PG 64-22, <0.3 million ESAL's, 9.5mm mix, 1 ^ inch compacted depth, SRL-L, in place as directed. Work includes 1 intersection. Contractor is responsible for submitting mix design for cold-in-place recycling at least 3 weeks prior to construction. Ross Township, Miralie Cappucci, Secretary