Specifications include, but are not limited to:. Approximately 1,065 tons Superpave 9.5 mm, Leveling, 2,188 tons Superpave 9.5 mm, Wearing and 140 tons Superpave 19mm, Wearing. These materials are to be furnished, delivered, applied and compacted at the direction of the township road master. Roadway is to be power broomed by the contractor prior to start of project. All material to be completed in place and work to include tack coat as per PennDOT Specifications Form 408, milling of pavement notches at intersecting roads and driveways and seal of joints and utilities; all are to be incidental to the paving. Milling of driveway notches are to be done as directed and in a fashion that maintains the shoulder slope and provides a smooth transition from the driveways to the shoulder.