Specifications include, but are not limited to: • Ornamental iron railing pickets to be straight for front and rear to bring railing to city code compliance, Railing to 36” high • Railing on the first set of stairs in front to be drilled into cheek wall, right side going up railing at top to make a 90degree turn continue 7’ to edge of sidewalk running parallel with hillside • Four post core drilled into concrete and set with hydraulic cement • Rail on stairs to have two post per side drill into cement. Total LF. 47’ • Rear picket railing for two sets of stairs and landing. All post to be placed into dirt with concrete • Picket railing to be 36” high as code requires. Total LF. 54’ • Railing to be black primer • Vendor to dispose of existing railing.