Specifications include, but are not limited to: The Project consists of the demolition of a residential structure located at 185 North Main Street, including disconnection and termination of existing utilities, erosion and sediment controls, maintenance and protection of traffic, backfill and stabilization of the site, removal and disposal of waste including asbestos and lead materials, and related work. 1. The separation and salvaging of topsoil or topsoil mixture encountered in grading the project and depositing it in stockpiles at locations on or adjacent to the project site. 2. The furnishing and placing of topsoil from outside the project, as indicated. 3. The preparation of indicated areas and the placement of topsoil or topsoil mixture on the prepared areas, using topsoil or topsoil mixture removed from stockpiles located on the project or from other indicated areas. 4. The furnishing and placing of seed and soil supplements of the type indicated, the application of herbicides, and mowing requirements. 5. The furnishing, placing, anchoring, and maintaining of mulch of the type indicated.