The project includes the removal of an existing single span steel beam open grate bridge including abutments, wingwalls and footers; and replacement with a single span reinforced concrete bridge (ridged frame structure) including wingwalls and footers. The existing bridge has an overall span of 29’-9”, the existing bridge roadway has a curb to curb width (between railings) of 24 feet. The proposed bridge has an overall span of 30 feet, the proposed bridge roadway has a curb to curb width (between railings) of 30’. Construction will occur in a Township right-of-way and will include all required demolition, grading, restoration work, installation of bituminous concrete pavement, lawn area restoration, along with provisions for all necessary erosion and sedimentation controls.