Specifications include, but are not limited to: Phase 1: Validate, Evaluate, Recommend, and Design New UV System Phase 2: Construction and Programming Services, System Testing and O & M Plan ; 1. Review reference documents and existing system. 2. Validate the need for UV system upgrades. 3. Evaluate and provide alternatives to UV system upgrades and provide preliminary cost analysis. Alternatives analysis shall incorporate the following at a minimum: a. develop design criteria vetted through City’s project team; b. ability to meet DEQ requirements and potential future requirements; Recommend preferred alternative a. Recommendation shall be from reliable validated source. b. Recommendation should include the pros and cons for water reuse. ; PHASE 2: 1. Provide technical assistance during bidding, construction installation, programming and testing. 2. Provide inspection services for all phases of construction, installation, programming and testing. 3. Provide Operations and Maintenance Plan upon completion of project. O&M Plan must meet DEQ requirements.