Specifications include, but are not limited to: supply four new tricking filter rotary distributors and associated equipment and services, including engineering, design, manufacturing, fabrication, shipping, delivery, installation oversight, training, startup, commissioning, testing, installation instructions, and O&M manuals ; 1) Attend initial Kickoff Meeting with City and Engineer within 2 weeks of receiving Notice to Proceed (to be attended by Supplier’s Project Manager in person at the job site and other Supplier staff available via phone or videoconference). 2) Participate in weekly design coordination conference calls with the City and Engineer. 3) Assist Engineer with the configuration and layout of selected equipment and associated piping, valves, gates, panels, instruments and associated appurtenances including preparation of associated drawings. 4) Provide preliminary drawings of equipment to be supplied to assist the Engineer with completing the contract documents for construction.