Specifications include, but are not limited to: 1.SITE INVESTIGATION, DATA COLLECTION, RECORD RESEARCH •Review existing records and data including but not limited to geographic information system (GIS) data, drawings, maps, and other documents relevant to the limits and scope of this project. •Locate on-site utilities and contacting utility companies for existing base maps. •Visually inspect facility grounds for potential EPSS placement site and potential conflicts. •Perform topographic survey at a scale and extent appropriate for this development. •Identify utility relocation or extension needs 2.PRELIMINARY DESIGN (50% DESIGN SUBMITTAL) •Prepare base mapping which includes elevations, utilities, right-of-way, easement, and other pertinent features. •Develop preliminary design, showing existing and proposed improvements. •Prepare list of technical specifications and engineer’s cost estimate.