Specifications include, but are not limited to: The proposed garage will be 1,600 square feet. The primary structure for the pole building was designed by Alliance Engineering. The building site has been overlaid with a layer of gravel of varying thickness. The contractor shall modify the existing subgrade and existing gravel fill in order to comply with the site preparation recommendations outlined in the attached geotechnical report. Site work includes site preparation, excavation, grading, filling and sidewalks as shown on the attached drawings and in the attached geotechnical reports. The specified wood roof trusses have been previously design, fabricated and delivered to the site, and have been stored on site for several months.