Specifications include, but are not limited to: Chilled Water Expansion. Connect to existing chilled water piping with new and route it up to penthouse, route new chilled water piping in penthouse and connect to two existing chilled water coils that serve AHU-305 and AHU-304. Insulation, pipe hangers and supports. Condensate pump installation not including electrical scope. PSU to provide all power requirements to condensate pumps. Core drilling and concrete scanning. Building Automation System (BAS) Controls Scope: o Contractor shall provide all controls components (sensors, devices, controllers if needed, control enclosures if needed etc.) control valves, programming, engineering and graphics. o PSU to provide all conduit, pathways and wire. In addition, PSU will terminate wiring at all controllers, control components, control valves and mechanical equipment.