Specifications include, but are not limited to: Contractor shall fabricate and install wheel stop deflectors in Bay 1 at MSS. These are to be installed at the edge of the dump pit against the existing wheel stops as shown in the attached sketch The selected contractor shall fabricate deflector plates and wide flange bracing in its shop. Then the contractor will bring the materials to the site for layout and fit-up before returning to its shop for welding. The contractor will install wide flange and plate as shown in sketch included as Attachment A. Two 12 foot long deflector sections will be installed and then field tested for two months. Additional sections will be requested, if field testing demonstrates success.