Specifications include, but are not limited to: below and as per the attached drawings and photograph(s), hereto attached as Attachment A and Attachment B respectively. • The existing gutter on the southwest side of the main building is estimated to be 225 feet. • Contractor shall remove the existing gutter on the southwest side of the main building. • Contractor shall remove and dispose or recycle all debris and old gutters, from the Metro facility. • Contractor shall install and seal closure flashing between the roof and wall. • Contractor shall install new gutters and downspouts with 24 gauge minimum, 8-inch depth, and 8-inch opening. • Contractor shall coordinate with Metro to schedule its work in and around the Metro facilities to not impede or interrupt other facility operations (facility hours for commercial operations are 2:00 a.m. to 7:00 p.m.). This may require the contractor to schedule deliveries, shipments and some work for the hours between 5:00 p.m. and 3:00 a.m. Metro’s Household Hazardous Waste facility is staffed and operation Monday through Saturday 6:00 a.m. to 4:30 p.m. • The contractor’s work and equipment staging shall be in the area shown in the drawings. • The contractor shall complete its onsite work within four weeks’ time.