Specifications include, but are not limited to: 2.4.2.1.1 Develop and e-mail a pre-inspection agenda to the local personnel, with a copy to Agency Risk Consulting Unit contact. 2.4.2.1.2 Contact local site contact to confirm schedule, scope of survey, records to be reviewed onsite, building areas to visit, and instructions for site access and security. 2.4.2.2 Meet with local contact to discuss the overall facility operations, and conduct a general tour to review construction type, specific occupancy and hazards, protection levels, exposures, and fire prevention and protection features and practices. 2.4.2.3 Review existing loss prevention management programs, including hot work, impairment handling, emergency response, housekeeping, roof condition assessment, contractor management, and management of change. 2.4.2.4 Conduct a review of the existing fire protection systems and protection equipment, and perform a general evaluation of protection levels. Comment with regard to protection levels typically associated with the risks encountered. 2.4.2.5 Review on-site records for most recent fire pump and/or other fire system and alarm tests, and report on results (no testing required). Review the equipment as encountered to determine if information found appears to reflect properly functioning equipment. Where needed, contact local water authorities to obtain the most recent available water flow test information. 2.4.2.6 Review and analyze the site’s susceptibility to physical exposures (buildings, storage, processes, etc.) and natural hazard loss exposures (flood, earthquake, etc.). 2.4.2.7 Review and analyze site’s susceptibility to earthquake, including building and equipment exposure. 2.4.2.8 Gather flood loss control features for visited facilities which lie in FEMA A, B, or X500 zones.