Specifications include, but are not limited to: 1. Verify IMP manufacture and submittals are approved prior to ordering any material. 2. Field verify all dimensions prior to ordering material. 3. Prepare IMP’s on‐site (extra precautions shall be taken to ensure IMP’s are not damaged during prepping, flying, or setting). 4. Verify all material is on‐site prior to any tear‐off. 5. Verify weather conditions will hold throughout IMP installation or have plan in place to temporarily dry‐in any areas that have been torn‐off. 6. Remove and dispose of three manual operated ridge vents. 7. Decommission, remove, and dispose of three round exhaust vents. 8. Remove metal trim, gutter, down spouts, fiberglass panels, roof metal, and insulation. 9. Install new insulated roof panels. 10. Install new rain gutter system compatible with insulated roof panel system. 11. Install new commercial grade and size downspouts. 12. Install reverse ridge cap on underneath side of panels. 13. Use two part closed cell foam insulation to seal void between panels at ridge 14. Install new gable trim on west end of building. 15. Install custom gable trim/Side wall flashing on east end of building. (This is to transition from new roof to existing roof that is staying in place over wash‐bay) 16. Install new rubber roof jacks on all existing vent pipes 17. Install wall mounted 1500 CFM exhaust fan with electrical actuated louver.