Specifications include, but are not limited to: At the end of the project duration the Port of Newport will receive the following deliverables: 1. Permit plans/electrical schematics for 50 amp service and new marine power pedestals on Port Docks 5 & 3. 2. Cost estimates for three different pedestal designs; selections may be provided by Port staff. A minimum of one option shall have the ability to remotely manage and monitor usage. Estimate shall be inclusive of the total cost to complete the upgrade and installation. 3. Conditional assessment of the current state of the electrical infrastructure at the facility. The assessment shall not require destructive inspection or exploratory work, but shall include Request for Consultant Qualifications 5 analysis of current load usage vs. current capacity and a general narrative of the material condition of the existing infrastructure. 4. An assessment of the compatibility of existing infrastructure to accommodate the conductors necessary to accomplish the desired service amperage. 5. Drawings of any required alterations to the facility to accomplish the Port’s objectives of replacing aging marine power pedestals and upgrading to 50 amp service at the pedestal.