Specifications include, but are not limited to: Contractor shall install a new diesel storage tank, remote fill station and venting; move generator fuel connections from the old tank to the new tank; remove the old tank and fuel supply tubing; and clean out the old tank room. Work shall be performed according to the construction drawings and specifications attached as Exhibit A. Please note that the drawings provided are based on a design that was completed prior to Metro’s launch of an emergency chiller replacement project at Keller, which is taking place in the same room where the new tank will be installed. The chiller project has caused a delay in this project, and the final design will likely vary from that provided here due to the need to coordinate fuel piping locations and components with the placement of cooling system piping and components. We don’t expect the overall design to be impacted significantly. If the updated design causes the project cost to vary significantly, we will handle the update via a contract amendment at that time.