Specifications include, but are not limited to: 36.3.1 Pre-Design Phase • Program Development and Documentation Reviewer • Detailed project schedule. • Project kick-off meeting. This meeting will be prior to the eco-charette, conducted shortly after the Notice to Proceed. • Meeting notes for the project kick-off meeting distributed to attendees. 36.3.2 Schematic Design Phase • Fully developed schematic design options based on the final Program. • Preliminary cost estimate at end of SD, value analysis proposal if over budget. 36.3.3 Design Development Phase • Attend design, review and process meetings as previously described, and distribute meeting notes to attendees. • Cost estimate at end of DD with value analysis proposal if over budget 36.3.4 Construction Document Phase • Submit review documents at 50% and 90% complete. • Final cost estimate at 90% complete. • Submit applications to permit to all review authorities respond to check sheet comments and make changes to CD’s as required.