Specifications include, but are not limited to: 1ST FLOOR GANG SHOWER (1 EACH) DEMOLITION • Disconnect and remove existing floor drains and cap associated waste and vent piping not used. • Where necessary, saw cut and carefully remove select areas of CMU walls at plumbing chase to accommodate installation of new plumbing supply lines, associated fixtures and waste vents. (maintain structural wall integrity) • Haul away all demolition debris daily. NEW PLUMBING INSTALLATIONS DRAIN WASTE AND VENT PLUMBING • Supply, install and connect all new drain, waste and vent piping as necessary, to Owner supplied and installed - precast composite shower floor trench drains with 4” outlets. • Cap and remove existing unused waste piping where possible. POTABLE WATER PLUMBING SUPPLY LINES AND FIXTURES • Supply, install and connect all new potable water supply lines, valves, fixtures and trim for showers. WALLS CMU WALL INFILLS AND REPAIRS • Infill/Repair all CMU wall demolition and prepare surface for installation of new fiberglass reinforced epoxy wall coatings. FIBERGLASS REINFORCED EPOXY WALL COATINGS WITH URETHANE TOP COAT • Supply and install all shower wall coatings as specified.