Specifications include, but are not limited to: Phase 1. Preliminary Engineering (PE) and Design Preliminary Engineering (PE) and Design The Consultant shall prepare and submit a preliminary design of the proposed alternative(s) for the bridge. This will include, but not be limited to: a cross section of the proposed roadway horizontal and vertical alignments geotechnical/foundation report hydraulic study report including Sour Analysis environmental permitting, and memos required for Final Design type, size & location of structure identification of necessary design exceptions updated engineer’s opinion of probable cost Phase 2. Final Design and Bidding Assistance Final Design Consultant shall provide all engineering services necessary to prepare a bid package for the bridge in accordance with the County’s policies and procedures. Right of Way and Utility Relocation Consultant shall provide all services necessary to acquire right of way and relocate conflicting utilities for the project in accordance with County’s policies and procedures. This includes properties currently owned by private, commercial, and agency entities. Bidding Assistance Consultant shall provide bidding assistance and analysis services during the final Plans, Specifications and Estimate (PS&E) process and the advertising period for each structure.