Specifications include, but are not limited to: replacing and improving the existing storm water system on Cedar Way SE from Summer Street SE to Pheasant Avenue SE, and Pheasant Avenue SE from Cedar Way SE, south to termination; including the installation of catch basins; the installation of manholes; and installation of new 10-inch PVC and Ductile Iron storm lines. The installation of a rain garden at the Salem Municipal Airport; including the installation of an irrigation system; the installation of catch basins; the installation of 10-inch PVC and Ductile Iron storm lines. The existing storm lines will be replaced or abandoned. The project shall also require any associated asphalt concrete pavement, Portland Cement sidewalk, curb, driveway, and aggregate shoulder. Existing surfaces will need to be restored.