Specifications include, but are not limited to: The work to be completed under this Contract consists of the following work located along Interstate 5, at various locations southbound between mile points 140.0 and 148.5, in Douglas County, OR: Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Asphalt Tack Coat, and furnish and place Level 4, ½” Dense Asphalt Concrete Pavement at the following locations and as directed: Location Length Width Depth SB: MP 140.0 – MP 140.4 slow lane 2,112’ 13’ 4” SB: Exit 148 on-ramp 325’ 16’ 4” The limits of the work areas will be marked on site. See RD610 for additional information. Perform additional and incidental work as detailed in the Contract plans and specifications or as directed.