Specifications include, but are not limited to: The proposed pedestrian improvements project includes construction of four separate sections of new sidewalk, curb improvements and three rapid rectangular flashing beacon assembly (RRFB) bases and concrete flatwork. Sidewalk construction includes both planter strip and curb tight type for a total linear sidewalk footage of 650 feet. The project includes approximately 375 linear feet of type "C" curb and 275 feet of curb and gutter. Incidental improvements with the new sidewalk sections include storm drainage improvements, paving, retaining wall and fencing construction, ADA ramp retrofitting and minor landscaping restoration. The project also includes installation of 3 RRFB concrete bases along with concrete flatwork, signage, striping and ADA ramp retrofitting.